SAMPLE WORKSHEET in CSI FORMAT

Orion Technical follows the Construction Specifications Institute format of coding work items.

Costcode Description Qty Unit MATERIAL$/ Unit Labor        Hrs/Unit LABOR $/Unit OTHER $/Unit TOTAL  $/Unit
02 SITEWORK              
02050 DEMOLITION              
020501110 Demo concrete foundation, 1Ft x 2Ft, no reinf.   Lf 0.00 0.300 8.48 4.35 12.83
020501120 Demo concrete foundation, 1Ft x 2Ft, with reinf.   Lf 0.00 0.400 11.30 5.55 16.85
020501130 Demo concrete foundation, no reinf.   Lf 0.00 2.500 70.63 34.65 105.28
020501140 Demo concrete foundation, with reinf.   Lf 0.00 3.750 105.94 52.50 158.44
020501250 Demo wood frame building, 1 floor   Sf 0.00 0.060 1.70 0.85 2.55
020501260 Demo wood frame building, 2 floors   Sf 0.00 0.070 1.98 0.95 2.93
020501310 Ceiling demolition   Sf 0.00 0.018 0.51 0.10 0.61
020501320 Flooring demolition, ceramic tile   Sf 0.00 0.040 1.13 0.27 1.40
020501330 Flooring demolition, linoleum   Sf 0.00 0.012 0.34 0.00 0.34
020501410 Plumbing demolition, fixture    Ea 0.00 1.450 40.96 14.00 54.96
020501510 Demo masonry construction   SfFl 0.00 0.150 4.24 1.60 5.84
020501520 Demo reinforced masonry   SfFl 0.00 0.180 5.09 2.10 7.19
020501530 Demo concrete construction   SfFl 0.00 0.210 5.93 1.70 7.63
020501540 Demo reinforced concrete    SfFl 0.00 0.240 6.78 2.40 9.18
020501550 Debris removal   Cy 0.00 0.900 25.43 14.00 39.43
020501610 Partition removal, brick   Sf 0.00 0.035 0.99 0.95 1.94
020501620 Partition removal, wood with drywall   Sf 0.00 0.040 1.13 0.95 2.08
020501630 Door removal, wood   Ea 0.00 0.960 27.12 0.30 27.42
020501640 Window removal, trims   Ea 0.00 2.450 69.21 0.00 69.21
020501650 Wall removal, conc block   Sf 0.00 0.035 0.99 0.95 1.94
020501680 Demo, drywall   Sf 0.00 0.032 0.90 0.00 0.90
020501690 Demo, stucco or plaster wall   Sf 0.00 0.042 1.19 0.00 1.19
020501710 Roof demolition, built up roof   Sq 0.00 3.100 87.58 52.50 140.08
020501730 Roof demolition, wood shingles   Sq 0.00 1.000 28.25 23.50 51.75
020501810 Paving demo, no reinforcement   Sy 0.00 0.350 9.89 2.90 12.79
020501820 Paving demo, with wire mesh   Sy 0.00 0.480 13.56 2.90 16.46
020502110 Concrete slab demo, 4 in, no reinforcement   Sy 0.00 0.650 18.36 5.35 23.71
020502120 Concrete slab demo, 4 in, with reinforcement   Sy 0.00 0.950 26.84 5.35 32.19
020502130 Saw cutting, paving   Lf 0.00 0.042 1.19 0.40 1.59
020502140 Saw cutting, concrete   Lf 0.00 0.075 2.12 0.60 2.72
020503110 Remove chain link fence, 6 Ft high   Lf 0.00 0.050 1.41 0.35 1.76
020503310 Remove water pipe   Lf 0.00 0.180 5.09 1.85 6.94
SAMPLE ESTIMATE ONLY
in CSI FORMAT
020503510
Remove septic tank, 1200 gallons   Ea 0.00 40.000 1130.00 390.00 1520.00
02060 HAZARDOUS MATERIALS              
020602110 Asbestos test, lab samples   Lot 0.00 0.000 0.00 150.00 150.00
020602120 Asbestos removal, acoustic ceiling   Sf 0.00 0.055 4.07 0.00 4.07
020602130 Asbestos removal, floor tile   Sf 0.00 0.055 4.07 0.00 4.07
020602140 Asbestos removal, drywall   Sf 0.00 0.055 4.07 0.00 4.07
020602150 Asbestos removal, siding   Sf 0.00 0.040 2.96 0.00 2.96
020602160 Asbestos removal, roofing, built-up roof   Sf 0.00 0.075 5.55 0.00 5.55
020602170 Asbestos removal, tank insulation   Ea 0.00 8.000 592.00 0.00 592.00
020602180 Asbestos removal, pipe insulation   Lf 0.00 0.115 8.51 0.00 8.51
020602190 Asbestos removal, stucco   Sf 0.00 0.080 5.92 0.00 5.92
02100 SITE PREPARATION              
021001120 Clear and grub, light, with machine   Acre 0.00 50.000 1412.50 1205.00 2617.50
021001130 Clear and grub, medium, with machine   Acre 0.00 70.000 1977.50 1710.00 3687.50
021001140 Clear and grub, heavy, with machine   Acre 0.00 85.000 2401.25 2275.00 4676.25
021001210 Tree removal, 12" - 16" dia   Ea 0.00 3.000 84.75 14.50 99.25
021001220 Tree stump removal, 12" - 16" dia   Ea 0.00 2.000 56.50 11.15 67.65
02200 EARTHWORK              
022001000 Excavation work, minimum charge   Lot 0.00 5.000 141.25 290.00 431.25
022001010 Foundation excavation   Cy 0.00 0.280 7.91 5.00 12.91
022001020 Foundation backfill and compaction   Cy 0.00 0.210 5.93 5.60 11.53
022001110 Hand excavation, medium soil   Cy 0.00 1.750 49.44 0.00 49.44
022001120 Hand backfill, medium soil   Cy 0.00 0.600 16.95 0.00 16.95
022001210 Grading, rough   Acre 0.00 4.500 127.13 110.00 237.13
022001220 Grading, fine   Acre 0.00 6.500 183.63 140.00 323.63
022001410 Utility trench excavation, 1-1/2' deep, medium soil   Lf 0.00 0.008 0.23 0.19 0.42
022001420 Utility trench excavation, 1-1/2' deep, hard soil   Lf 0.00 0.010 0.28 0.22 0.50
022001430 Utility trench backfill, 1-1/2' deep   Lf 0.00 0.006 0.17 0.19 0.36
022001510 Utility trench excavation, 3' deep, medium soil   Lf 0.00 0.011 0.31 0.25 0.56

 

 

 

 


For More Information Contact:

ORION TECHNICAL SERVICES GROUP PHILIPPINES INC
2F, 8 Antonio Center Building, Prime Street, Madrigal Business Park 2, Alabang, Muntinlupa City 1780 Metro Manila
Tel: 632-842 8598
FAX: 632-842 8598
Internet: rgj@orionmanila.com

 

Company Quality Statement

QSi believes in the adherence to strict quality procedures and policies to guarantee thorough and accurate review of projects.

 